1. 360.000 Tons Hot Asphalt Paving Works,
2. 112.550 m³ Plentmixed Base Course Paving Works,
3. 750.350 m³ Filling Material Transportation, Laying, Filling, Watering And Compaction Works
4. Construction of Prestressed Concrete Beam Bridge (Bridge 1: Total Width 21.60 Meters, Length 160 Meters)
5. Construction of Prestressed Concrete Beam Bridge (Bridge 2: Total Width 21.60 Meters, Length 60 Meters)
Proje KonumuTürkmenbaşı, Türkmenistan
İşveren FirmaTurkmenistan Ministry Of Maritime And River - Gap İnş. Yatırım Ve Dış Ticaret A.Ş.
Proje Yılı2016 - 2018