Runway, Rotary Wings, Apron and Taxiway Excavation, Structural Filling, Base-Subbase Course Pavement and Concrete Pavement Works
•2.600.000 m³ Excavation, Filling Works,
•560.700 m³ Crushed Stone Basic Works,
•250.300 m² Asphalt Pavement Works,
•450.400 m² Apron Coating Concretes And Grouting Works
Proje KonumuLogar, AFGANİSTAN
İşveren FirmaU.S. Army Corps. Of Engineers - Metag İnşaat A.Ş.
Proje Yılı2009-2011






Yorum yok